Abdulmajid, S A D (1967) Resource forecasting models for private housing projects, Unpublished PhD Thesis, , The University of Manchester.

Adams, C D (1995) Procurement of microtunnelling projects, Unpublished PhD Thesis, , The University of Manchester.

Adul-Hamid, R (1996) Construction duration prediction using neural network methodology, Unpublished PhD Thesis, , The University of Manchester.

Coram, W R (1997) The privatisaton of the property services agency, Unpublished PhD Thesis, , The University of Manchester.

Eldosoky, A I (1987) Dealing with uncertainty in construction projects with particular reference to Egypt, Unpublished PhD Thesis, , The University of Manchester.

  • Type: Thesis
  • Keywords: uncertainty; government; major projects; risk identification; risk management; designer; Egypt; risk analysis; construction project; client
  • ISBN/ISSN:
  • URL: https://www.proquest.com/docview/2692068062
  • Abstract:
    Risk management has had limited application in the industry despite large schedule delays and significant experienced by clients and contractors on recent major projects. Some developments are essential to improve the credibility of the risk analysis techniques within the industry. This research is an attempt to further establish the concept of risk management for construction contracts.The study is primarily concerned with dealing with uncertainty in construction projects. A particular reference is given to the construction industry in Egypt. The main objectives of the research are: 1) to analyse and discuss the theoretical aspects of construction risk management and to introduce developments wherever possible, 2) to investigate, through application of risk management to tender preparation for a major construction project, how uncertainty changes during the life of the project and the interrelationship between cost and time, 3) to propose roles of the participants of the construction industry; the client, designer, local authority, government, and contractor, to mitigate construction risks, and 4) to make use of the experience gained during the research to suggest a set of recommendations for greater stability of the construction industry in Egypt.The approach of construction risk and uncertainty management consists of three main steps: risk identification, risk analysis and risk response. The present state-of-the-art of each research aspect is introduced and the author suggests necessary modifications. An earth dam with a constrained construction programme is chosen as the model to investigate how uncertainty changes during the life of a project. Roles of the different parties in construction risk management are proposed by consideration of ten different real-life projects. The projects are chosen in such a way that they can be representatives of a wide range of project types. Suggestions are given to improve contractual performance in Egypt taken into consideration the special situation of the industry.

Fenn, F P (1999) An aetiology of construction disputes, Unpublished PhD Thesis, , The University of Manchester.

Holden, S L (2021) Land, materials, and construction site: Decommodification through alternative construction, Unpublished PhD Thesis, , The University of Manchester.

Inyang, E D (1983) Some aspects of risk analysis for decision making in engineering projects management, Unpublished PhD Thesis, , The University of Manchester (United Kingdom).

Luo, J (1998) The transitional construction industry and sino-foreign construction joint ventures in the p.R. Of China, Unpublished PhD Thesis, , The University of Manchester (United Kingdom).

Luo, J and Gale, A (1998) The transitional construction industry and sino-foreign construction joint ventures in the p. R. Of China, Unpublished PhD Thesis, , The University of Manchester.

Merna, T (2004) Assessing methods to analyse portfolios of projects and their risks procured by project finance, Unpublished PhD Thesis, , The University of Manchester.

Mohamed Sultan, A A B (2019) Decision tools for recycling with a focus on fibre reinforced composites, Unpublished PhD Thesis, , The University of Manchester.

Ng, S-t T (1996) Case-based reasoning decision support for contractor prequalification, Unpublished PhD Thesis, , The University of Manchester (United Kingdom).

Nosair, I A R (1987) The relevance of computerised modelling techniques to construction management problems and training in Egypt, Unpublished PhD Thesis, , The University of Manchester (United Kingdom).

Nour, H A (2003) An information approach for enhancing the health and safety file, Unpublished PhD Thesis, , The University of Manchester.

Parvar, J (2003) Neural networks decision support system (decision to bid), Unpublished PhD Thesis, , The University of Manchester (United Kingdom).

Peacock, W S (1990) Site investigation procedures and risk analysis, Unpublished PhD Thesis, , The University of Manchester.

Samo, S R (1999) Energy conservation in UK housing and the effect of building regulations, Unpublished PhD Thesis, , The University of Manchester (United Kingdom).

Sansone, R (2020) Latent matters: Megaprojects and political imaginaries in post-revolution Tunis, Unpublished PhD Thesis, , The University of Manchester.

Shakeri, E (2002) An investigation of privately promoted infrastructure (ppi) strategy in developing countries: Public-private partnership (ppp) approach, Unpublished PhD Thesis, , The University of Manchester.

Sigonda, G G G (2000) The impact of infrastructural projects on the environment in Tanzania: The case of mindu dam, Unpublished PhD Thesis, , The University of Manchester.

Suraji, A (2001) Development and validation of a theory of construction accident causation, Unpublished PhD Thesis, , The University of Manchester.

Tipple, C (1993) An analysis of the development of the construction industry since the 18th century, Unpublished PhD Thesis, , The University of Manchester.

Wearne, S H (1969) Organization of large engineering design departments, Unpublished PhD Thesis, , The University of Manchester.

Yeo, K T (1982) A systems approach to cost management of large scale offshore oil projects, Unpublished PhD Thesis, , The University of Manchester.